Welcome to the Detailed Area Plan (DAP) Study page. This page includes study results on each component of the DAP. Articles summarizing the purpose and results of the DAP study are available in the following articles from the Scott County SCENE (Aug/Sept 2008) and the Prior Lake American (Jan 2, 2010).
To review the DAP study, figure maps, and sub-studies (attachments), follow the links on the left hand side of the page.
|
|
DETAILED AREA PLAN EXPECTED OUTCOMES
The Detailed Area Plan (DAP) addresses cumulative effects of development on natural resources, transportation, and storm water management and identifies effective mitigation strategies for the study area. Expected outcomes of the DAP process include: |
|
|
|
• Complete build-out analysis of the study area given planned densities; • Inventory and assess condition of existing infrastructure, including roads, bridges, and surface water ponds and drainageways; • Identify locations for township collector roads, needed turn-lanes and by-pass lanes, and opportunities for local road connectivity; • Establish township road access and interconnection to County highways; • Determine available water supply for drinking water and fire safety; • Regional trail corridor planning; and • Providing desirable long-term development that maintains and preserves the natural and cultural character of the study area. |
|
NOTE: Files are in PDF format. In order to view PDF files, you may download the free Acrobat Reader from Adobe.